Creating a foundation schedule (table) for a foundation job

  1. Create a foundation job.
  2. Perform the design.
    Tip: You can group isolated footings to control the number of different designs.
  3. Select the Detail and Schedule Drawing tab in the Main View window.
  4. Select the option for Schedule Drawing.
  5. (Optional) Click the Save Drawing Notes
  6. Click Save Drawing As…. The Save As dialog box (drawings) opens.
  7. Specify a name for the drawing and select the location where it will be saved.
  8. Click Save.